OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#8876 — Optical maintenance LDN <> AMS
Scheduled Maintenance Report for Network & Infrastructure
Completed
We will be carrying out maintenance works on the fibre optic between Londres and Amsterdam to resolve imbalance and weakening issues between the two cables on the Wickford <> London stretch.

The Wickford <> Londres stretch will be replaced by a new pair of fibres with a optimised line.

Update(s):

Date: 2013-06-27 13:31:34 UTC
Optimisation is finished. The optic link is operational again.

Date: 2013-06-27 13:30:27 UTC
The photonic link is back up. We have gained 10dB int the Wickford towards London direction and 8dB from London to Wickford.

Part optimisation of Raman amps is in progress.

Date: 2013-06-27 10:46:59 UTC
The patch was modified at Wickford, now we are doing the same on the London side.

Date: 2013-06-27 09:51:28 UTC
We are starting by changing the patch at Wickford.
Posted Jun 27, 2013 - 09:32 UTC