FS#4305 — FS#8239 — BT VoIP
Attached to Project—
VoIP
|
Incident |
|
Backend / Core |
|
CLOSED |
|
 |
We have an incident in the rack in London. Incoming calls from the BT network are impacted.
We investigate.
Date: Friday, 15 March 2013, 07:56AM
Reason for closing: Done
The link to the interconection is down:
5w6d: %LINK-3-UPDOWN: Interface GigabitEthernet0/48, changed state to down
The interconnection switch is off. We will replace it as soon as possible
The technician is going to site to change the faulty equipment.
The equipment has been replaced. Interconnections are again available.
Incoming calls are properly routed.