FS#4256 — FS#8191 — tgbt6
Attached to Project— Datacenters
Incident | |
New | |
CLOSED | |
![]() |
We have an electrical incident on tgbt6.
Date: Thursday, 07 March 2013, 15:23PMReason for closing: Done
Rooms 9 and 17 are impacted as well as infra vrack.
The power has been restored.
Infra vrack will again be operational in a few minutes
More details on the problem to follow.
The isolation transformer UPS 15 (room 17) was deficient.
The fault is traced back to the main breaker TGBT depriving energy inverters 11 (room 9) and 13 (room 11 and 1).
The defect was located and isolated then we restore power UPS 11 and 13.
UPS 15 (Room 17) remains cut off until the replacement of the isolation transformer.
The work should take half an hour.
Room 1 and 11 were not affected. Room 9 is still down 37 Kimsufi, 19 OVH Servers
Room 17 is still down. The replacement of the transformer take much longer than expected.
Work on UPS 15 continues...
We are losing a lot of time reinsert the cables in their places on the breaker.
The room will be on in 10 minutes.
Room 17 is UP.
All our teams are helping to boost the servers.
193 servers down
96 servers down on the room 17
Room 17, remaining :
- 51 ks
- 34 ns
Room 17, remaining :
- 47 ks
- 20 ns
Room 17, remaining :
- 29 ks
- 10 ns
Room 17, remaining :
- 17 ks
- 6 ns
Room 17, remaining :
- 16 ks
- 3 ns
The remaining 13 failures on whole RBX1 are "check filesystem".
Our enhanced night team is handling with the remaining problems.
The switches in the room 17 were switched to another electric arrival and will be reswitched tonight.