FS#12433 — FS#17059 — Newark, NJ, US <> London, UK, EU (100G)
Attached to Project— Network
Modernization | |
Whole Network | |
In progress | |
![]() |
We are entering a new era in the history of 100G at OVH: one where the sky is the limit!
Indeed, we are about to bring into production the first transatlantic 100G link.
This optical circuit concerns the northern end of the submarine cable FLAG Atlantic-1 (FA-1), with a 2-way latency of 67ms.
More info at http://www.submarinecablemap.com/#/submarine-cable/flag-atlantic-1-fa-1
The docking points of this cable are Skewjack, United Kingdom and Northport, New York, United States.
Within the coming days, we are going to produce other 100G transatlantic routes to reach a total capacity of 100G * 6 through different cables to ensure better redundancy.
Indeed, we are about to bring into production the first transatlantic 100G link.
This optical circuit concerns the northern end of the submarine cable FLAG Atlantic-1 (FA-1), with a 2-way latency of 67ms.
More info at http://www.submarinecablemap.com/#/submarine-cable/flag-atlantic-1-fa-1
The docking points of this cable are Skewjack, United Kingdom and Northport, New York, United States.
Within the coming days, we are going to produce other 100G transatlantic routes to reach a total capacity of 100G * 6 through different cables to ensure better redundancy.