Attached to Project— Network
Modernization | |
Backbone EU | |
In progress | |
![]() |
We will progressively increase the capacity towards Telia in London.
At present, we have 4x10G up on ldn-5-n7. These 4x10G will disappear in favor of 1x100G dn-1-n7 and 1x100G on ldn-5-n7.
The migration will be carried out in 3 steps:
- Activation of the traffic on ldn-1-n7 to 1x100G
- Cut of idn-5-n7 4x10G, traffic will be redirected to the idn-1-n7 1x100G
- Activation of the second 100G link on ldn-5-n7 to reach 2x100G of total capacity in London.
At present, we have 4x10G up on ldn-5-n7. These 4x10G will disappear in favor of 1x100G dn-1-n7 and 1x100G on ldn-5-n7.
The migration will be carried out in 3 steps:
- Activation of the traffic on ldn-1-n7 to 1x100G
- Cut of idn-5-n7 4x10G, traffic will be redirected to the idn-1-n7 1x100G
- Activation of the second 100G link on ldn-5-n7 to reach 2x100G of total capacity in London.
The flirt 100G are up. We are cutting the 4x10G.
The 2nd 100G are up.