OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#5225 — routage dc1 - 10-11/03
Scheduled Maintenance Report for Network & Infrastructure
Completed
We perform the same operation on dc1 rather thatn globalswitch last week: the introduction of cisco switches nexus. This will enable us to provide a 10G connectivity to our customers on dc1. No interruption of traffic is expected. The routing will be temporarily changed during the development of new equipments.


Update(s):

Date: 2011-03-11 00:28:43 UTC
The new switches PDC1-3-N5 and N5-4-PDC1 are set and all uplinks were switched .

Date: 2011-03-11 00:12:16 UTC
Uplinks to the p19-7 are switched. A few packets were lost but no cuts except for the Unitarians (2 cuts between 30s and 1min). We go to uplinks on p19-2.

Date: 2011-03-10 23:12:21 UTC
We switched uplinks pdc1-1 <> p19-7. Now we will begin with the links pdc1-2 <> p19-7.

Date: 2011-03-10 23:11:08 UTC
We started our works on pdc1-1-c1.
Posted Mar 10, 2011 - 15:54 UTC