FS#111 — FS#4216 — EDF: connection 1

Attached to Project— Datacenters
Incident
Paris 19
CLOSED
100%
A
25 May 2:12:34
the connection 1 from EDF had a break and we had a
default supply of 20000V. The controller switched
automatically feeding the datacentre P19
to the connection 2 in less than 10 seconds.
A
May 25 2:12:44
we had once again connection to 20000V.

During the time of the break 20000V, the datacentre has
worked on the inverters. We haven't had in any
incident in the service provided.

EDF are in the cell for high voltage
to check that all is well at our level. Apparently
a problem on the network in Paris at EDF 20000V.
The problem is fixed at present. We will switch back
manually on an arrival asap.

We have three independent connections to 20000V in P19.
Date:  Tuesday, 25 May 2010, 13:37PM
Reason for closing:  Done