FS#10719 — FS#14583 — pcc-205-n5 - fex112

Attached to Project— Network
Maintenance
Roubaix → RBX-2
CLOSED
100%
This Monday, September 7th 2015, t 10pm GMT + 2, we will replace a FET of a FEX uplink that is abnormally flapping.

No impact is expected.

To verify that this is the cause of problems on some hosts CCP, we have cut the port in question until Monday to confirm that the errors come from this port.
Date:  Wednesday, 09 September 2015, 15:12PM
Reason for closing:  Done
Additional comments about closing:  After 30 minutes of monitoring, no impact / new flap found.
Comment by OVH - Wednesday, 09 September 2015, 15:10PM

The intervention has started, we will change the 2 FET of one of the uplinks FEX 112. No impact is expected, the other uplink is currently supporting the load.


Comment by OVH - Wednesday, 09 September 2015, 15:11PM

The intervention is over, we will monitor before closing the work task and verify that the problem is fixed.

2015 Sep 7 23:26:03.897 pcc-205-n5 %ETHPORT-5-IF_ADMIN_UP: Interface Ethernet1/19 is admin up .
2015 Sep 7 23:26:05.447 pcc-205-n5 %ETHPORT-5-SPEED: Interface Ethernet1/19, operational speed changed to 10 Gbps
2015 Sep 7 23:26:05.448 pcc-205-n5 %ETHPORT-5-IF_DUPLEX: Interface Ethernet1/19, operational duplex mode changed to Full
2015 Sep 7 23:26:05.448 pcc-205-n5 %ETHPORT-5-IF_RX_FLOW_CONTROL: Interface Ethernet1/19, operational Receive Flow Control state changed to off
2015 Sep 7 23:26:05.449 pcc-205-n5 %ETHPORT-5-IF_TX_FLOW_CONTROL: Interface Ethernet1/19, operational Transmit Flow Control state changed to off
2015 Sep 7 23:26:05.451 pcc-205-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 0 of Fex 112 that is connected with Ethernet1/19 changed its status from Configured to Fabric Up
2015 Sep 7 23:26:05.643 pcc-205-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 2 of Fex 112 that is connected with Ethernet1/19 changed its status from Fabric Up to Connecting
2015 Sep 7 23:26:05.654 pcc-205-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 2 of Fex 112 that is connected with Ethernet1/19 changed its status from Connecting to Active
2015 Sep 7 23:26:06.810 pcc-205-n5 %ETH_PORT_CHANNEL-5-PORT_UP: port-channel112: Ethernet1/19 is up
2015 Sep 7 23:26:06.819 pcc-205-n5 %ETHPORT-3-IF_UP: Interface Ethernet1/19 is up in mode Fex Fabric