OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#14561 — sbg-200-n5
Scheduled Maintenance Report for Network & Infrastructure
Completed
A FEX is out-of-service on the sbg-200-n5. It's only got one uplink towards the n5.

Replacement schedules tonight from 10pm CEST.

Update(s):

Date: 2015-09-03 13:28:10 UTC
Fixed.

Date: 2015-09-03 13:25:56 UTC
The procedure is complete, the uplinks are now redundant:

sbg-200-n5# sh log | i 1/6
2015 Sep 1 22:44:39.908 sbg-200-n5 %ETHPORT-5-IF_DOWN_ADMIN_DOWN: Interface Ethernet1/6 is down (Ad
ministratively down)
2015 Sep 1 22:49:47.649 sbg-200-n5 %ETHPORT-5-IF_HARDWARE: Interface Ethernet1/6, hardware type cha
nged to No-Transceiver
2015 Sep 1 22:49:47.655 sbg-200-n5 %ETHPORT-5-IF_DOWN_NONE: Interface Ethernet1/6 is down (Transcei
ver Absent)
2015 Sep 1 22:49:58.216 sbg-200-n5 %ETHPORT-5-IF_DOWN_ADMIN_DOWN: Interface Ethernet1/6 is down (Ad
ministratively down)
2015 Sep 1 22:51:04.687 sbg-200-n5 %ETHPORT-5-IF_ADMIN_UP: Interface Ethernet1/6 is admin up .
2015 Sep 1 22:51:06.414 sbg-200-n5 %ETHPORT-5-SPEED: Interface Ethernet1/6, operational speed chang
ed to 10 Gbps
2015 Sep 1 22:51:06.414 sbg-200-n5 %ETHPORT-5-IF_DUPLEX: Interface Ethernet1/6, operational duplex
mode changed to Full
2015 Sep 1 22:51:06.414 sbg-200-n5 %ETHPORT-5-IF_RX_FLOW_CONTROL: Interface Ethernet1/6, operationa
l Receive Flow Control state changed to off
2015 Sep 1 22:51:06.414 sbg-200-n5 %ETHPORT-5-IF_TX_FLOW_CONTROL: Interface Ethernet1/6, operationa
l Transmit Flow Control state changed to off
2015 Sep 1 22:51:06.416 sbg-200-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 0 of Fex 102 that is conn
ected with Ethernet1/6 changed its status from Configured to Fabric Up
2015 Sep 1 22:51:06.569 sbg-200-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 2 of Fex 102 that is conn
ected with Ethernet1/6 changed its status from Fabric Up to Connecting
2015 Sep 1 22:51:06.585 sbg-200-n5 %FEX-5-FEX_PORT_STATUS_NOTI: Uplink-ID 2 of Fex 102 that is conn
ected with Ethernet1/6 changed its status from Connecting to Active
2015 Sep 1 22:51:07.669 sbg-200-n5 %ETH_PORT_CHANNEL-5-PORT_UP: port-channel102: Ethernet1/6 is up
2015 Sep 1 22:51:07.681 sbg-200-n5 %ETHPORT-5-IF_UP: Interface Ethernet1/6 is up in mode Fex Fabric

Date: 2015-09-03 13:25:01 UTC
We will start the replacement operation of the failing FET in a few minutes. It must be transparent.
Posted Sep 01, 2015 - 12:32 UTC