Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Following the incident this weekend on rbx-g5-A9 (https://travaux.ovh.net/?do=details&id=14541), we will take corrective action to ensure redundant uplinks of rbx2b-100ab-n6 -vrack by moving the uplink of rbx2b-100b-n6-vrack on a different card.
No impact is expected. The intervention is planned for tonight 31/08/2015 from 22:00 GMT + 2.
Update(s):
Date: 2015-09-01 13:45:28 UTC The procedure is completed.
31 Aug 2015 21: 11: 53,973 rbx2b-100b-n6-vrack% ETH_PORT_CHANNEL-5-PORT_DOWN
: Port-channel15: port-channel15 is down
31 Aug 2015 21: 18: 16,655 rbx2b-100b-n6-vrack% ETHPORT IF_UP-3-p Interface
ort-channel15 is up in mode trunk
No impact found, lost 0 pings, with some lag during ascent LACP.
We are monitring to verify that there is no CRC on the port.
The couple is now physically redundant on two different cards.
Date: 2015-09-01 13:42:11 UTC The operation will start. We will cut the port, move physically to a new card and set it on again.