FS#10680 — FS#14547 — rbx2b-100b-n6-vrack

Attached to Project— Network
Maintenance
Roubaix
CLOSED
100%
Following the incident this weekend on rbx-g5-A9 (https://travaux.ovh.net/?do=details&id=14541), we will take corrective action to ensure redundant uplinks of rbx2b-100ab-n6 -vrack by moving the uplink of rbx2b-100b-n6-vrack on a different card.

No impact is expected. The intervention is planned for tonight 31/08/2015 from 22:00 GMT + 2.
Date:  Tuesday, 01 September 2015, 15:43PM
Reason for closing:  Done
Additional comments about closing:  The procedure is completed.

31 Aug 2015 21: 11: 53,973 rbx2b-100b-n6-vrack% ETH_PORT_CHANNEL-5-PORT_DOWN
: Port-channel15: port-channel15 is down

31 Aug 2015 21: 18: 16,655 rbx2b-100b-n6-vrack% ETHPORT IF_UP-3-p Interface
ort-channel15 is up in mode trunk

No impact found, lost 0 pings, with some lag during ascent LACP.

We are monitring to verify that there is no CRC on the port.

The couple is now physically redundant on two different cards.
Comment by OVH - Tuesday, 01 September 2015, 15:42PM

The operation will start. We will cut the port, move physically to a new card and set it on again.

No impact is expected.